Case Study: APACS DCS Migration to Siemens PCS 7

Josh Dalzell | November 30th, 2018

An industrial utility service company in Kentucky needed to upgrade and migrate its distributed control system (DCS), which came with a few challenges.

DTE Calvert City (DTECC) made the decision three years ago to upgrade their obsolete Process Suite HMI to APACS OS. For 15 years, APACS DCS had been a reliable and comfortable system that was used to maintain the operational functionality for a plant that generated power and utilities around the clock. However, now the APACS hardware lifespan was coming to an end due to a decrease in both new and used replacement components and an end to the support for the human-machine interface (HMI) and APACS hardware.

Cross Company, a certified PCS7 Solution Partner for Siemens, had built trust with DTECC by implementing the smooth transition to APACS OS. DTECC reviewed their needs, concerns, and questions and chose Cross Company to migrate their APACS DCS to a full Siemens PCS 7 system implementation. 

Cross Group - Process Control Integration

What Comprises a Good Control Panel Design?

Barry Meade | November 10th, 2016 Most of us have seen a clean, well-organized control panel out on the factory floor – you know it when you see it! Conversely, you also know a poorly designed panel when you see it – not well laid out, crowded, messy, wires hanging all over the place, etc. Whereas

Read More »
Cross Group - Process Control Integration

How To Evaluate a Systems Integrator for Your Distillery

John Loose | October 30th, 2018 Evaluating a Systems Integrator for upcoming projects is an important part of the project process and the decision typically affects more than one project. This will end up being a relationship that lasts over a number of projects and multiple years. Documentation A well-established documentation system is a key to

Read More »
Cross Group - Process Control Integration

8 Factors For Process Automation Project Success

Robbie Peoples, P.E. | September 24th, 2018 Complex integration projects can present a level of ambiguity even for seasoned project managers. Keeping a close watch on budget and schedule are critical for success, but are not enough to ensure the project is a success in the eyes of a customer. Maintaining customer satisfaction can be the most

Read More »
Scroll to Top